Here's a list of all the projects for the Neal House, in order of priority.
Project Day #1
- mold behind bathroom wall (safety concern)
- Put kitchen cabinet door back on
- replace screen door on front of the house
- add shelf in lower kitchen cabinet
- replace or fix outlets in dining room
Project Day #2
- clean out porch
- build art desk (can't be done till porch is cleaned out and butcher block table is moved to porch)
Project Day #3
- patch the holes in the bathroom wall and door
- Grout and tiles in shower
- replace front bathroom medicine cabinet with flat mirror
- replace front bathroom sink with pedestal sink (need new storage idea for bathroom) or new vanity
- paint bathroom walls (can't be done till we patch the holes)
Project Day #4
- fix/add drawers to kitchen where the old drawers used to be
- fix kitchen counter tops/replace counter tops
- repaint/touch up paint on kitchen walls and cabinets (should be done before we replace the floor the kitchen)
Project Day #5
- replace flooring in kitchen
- remove fireplace and rocks
- replace flooring in family room (can't be done till we take out fireplace and rocks)
- T-strip between kitchen and dining room (can't be done till flooring in kitchen is replaced)
- T-strip between back bathroom and back bedroom
Project Day #6
- replace or clean screen door on back of house
- new knobs on pantry doors
- electric work in dining room and back bedroom
- light fixtures in dining room and back bedroom